Temporary protection in nuclear plant
Our last industrial project has been delivered on time to our French client EDF Nuclear Branch.
Built on a nuclear plant in France, this temporary building is a combination of several know-hows. Its overall dimensions: 30mx30mx10m high. It is composed of 2 separated working areas and 2 large flexible sliding doors (5m high) for material access. Pressurized dry air, water, electrical power and 300Lux light are provided. It will then be dismantled and removed from the place with no impact at all.
Many Thanks to all our partners and contributors on this short term construction that has been driven on a 5 months period. Great job accomplished!