{"id":630,"date":"2015-06-30T14:25:57","date_gmt":"2015-06-30T12:25:57","guid":{"rendered":"http:\/\/enginova-solution.com\/?p=630"},"modified":"2017-11-02T08:25:23","modified_gmt":"2017-11-02T07:25:23","slug":"edf-centre-dingenierie-du-parc-nucleaire","status":"publish","type":"post","link":"https:\/\/enginova.fr\/en\/2015\/06\/30\/edf-centre-dingenierie-du-parc-nucleaire\/","title":{"rendered":"NUCLEAR ENGINEERING CENTER"},"content":{"rendered":"<strong><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-616 alignleft\" src=\"http:\/\/enginova-solution.com\/wp-content\/uploads\/2017\/01\/actus-industrie-edf2-300x140.jpg\" alt=\"\" width=\"331\" height=\"169\" \/>For EDF Nuclear Engineering Center, the design and implementation of a specific temporary shelter<\/strong> of 30m x 30m x 10m high, used by EDF and AREVA in 2014 as part of a major maintenance program on the primary circuit during a reactor shutdown. The building is a covered scaffolding structure. Inside, the air temperature is controlled. Pressurized dry air, water supply, electrical power and light of 300Lux are also provided. It is accessible through 2 sectional sliding doors (height 5m) and 5 standard fire doors. Interior soft walls are fire resistant. The implantation on site was very tricky because of a very restrictive settlement area.","protected":false},"excerpt":{"rendered":"<p>For EDF Nuclear Engineering Center, the design and implementation of a specific temporary shelter of 30m x 30m x 10m high, used by EDF and AREVA in 2014 as part of a major maintenance program on the primary circuit during a reactor shutdown. The building is a covered scaffolding structure. Inside, the air temperature is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":615,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,5],"tags":[],"class_list":["post-630","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualites-enginova","category-actualites-industrie"],"_links":{"self":[{"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/posts\/630","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/comments?post=630"}],"version-history":[{"count":3,"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/posts\/630\/revisions"}],"predecessor-version":[{"id":636,"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/posts\/630\/revisions\/636"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/media\/615"}],"wp:attachment":[{"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/media?parent=630"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/categories?post=630"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enginova.fr\/en\/wp-json\/wp\/v2\/tags?post=630"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}